Metro is openStatusCalculatorRUEN

Almaty Metro Line 1 — Raiymbek Batyr – Baurzhan Momyshuly

The only line of the Almaty metro: from Raiymbek Batyr to Baurzhan Momyshuly.

Updated: July 2026
11
stations
~24 min
end to end
7–8 min
peak interval
Raiymbek Batyr ↔ Baurzhan Momyshuly
termini

Line 1: Raiymbek Batyr – Baurzhan Momyshuly

The Almaty metro consists of one line with 11 stations and a total length of about 14 kilometres. The line runs from the north-east of the city to the south-west — from Raiymbek Batyr station near Raiymbek Avenue to Baurzhan Momyshuly station in the western part of Almaty.

A ride from end to end takes about 24 minutes. Trains run from 06:20 to 00:00 at intervals of 7–8 minutes during rush hour and up to 10–13 minutes at other times. Fares are paid with the Onay transport card — 120 tenge per ride.

All stations have a single platform and no interchanges, so it is impossible to get lost: you simply choose the right direction. Each station is designed in its own style, with national motifs, mosaics and lighting.

Good to know: the Almaty metro has one line and no interchanges — you only choose the direction. Pay with the Onay card: 120 tenge per ride, reduced fare 60 tenge.
Almaty Metro, Line 1 · photo Wikimedia Commons

Stations on Line 1

Stations in the Raiymbek Batyr → Baurzhan Momyshuly direction. Times are cumulative from the first station and estimated from average running times between stations.

Line 1 · Raiymbek Batyr – Baurzhan Momyshuly

Travel time between stations

StationNextTravel timeTotal
Raiymbek BatyrZhibek Zholy2 min2 min
Zhibek ZholyAlmaly2 min4 min
AlmalyAbay2 min6 min
AbayBaikonur3 min9 min
BaikonurAuezov Theatre2 min11 min
Auezov TheatreAlatau3 min14 min
AlatauSairan3 min17 min
SairanMoskva2 min19 min
MoskvaSaryarka2 min21 min
SaryarkaBaurzhan Momyshuly3 min24 min

Line 1 timetable

First train (Mon–Fri)06:20
Last train (Mon–Fri)00:00
First train (Sat–Sun)06:20
Last train (Sat–Sun)00:00
Peak interval7–8 min
Daytime intervalup to 10 min
Evening interval10–13 min
Weekend interval10–13 min
End-to-end time~24 min
Please note: almatymetro.com is an independent information site and is not affiliated with the Almaty Metro (KGP «Metropoliten»). Fares, timetables and operating hours may change — check the official information before you travel at metroalmaty.kz.

History of Line 1

2011
The metro opened on 1 December — the first section of 7 stations from Raiymbek Batyr to Alatau.
2015
The line was extended by two stations — Sairan and Moskva.
2022
Saryarka and Baurzhan Momyshuly stations opened — the line reached 11 stations.
2026
The city plans to extend the line further west — to Kalkaman.

Good to know about this line

Good to know

One line — no interchanges

The Almaty metro has a single line, so there are no interchanges between lines. You only need to choose the direction: towards Raiymbek Batyr or towards Baurzhan Momyshuly.

Good to know

Paying with the Onay card

Fares are paid with the Onay transport card — 120 tenge per ride, reduced fare 60 tenge. You can tap the card on the validator at the turnstile or pay by QR code from your phone.

Frequently asked questions about Line 1

The Almaty metro has 11 stations on one line — from Raiymbek Batyr to Baurzhan Momyshuly.

About 24 minutes from end to end. Between adjacent stations the train takes roughly 2 minutes.

The metro runs daily from 06:20 to 00:00. The first train is at 06:20 and the last around midnight.

A single ride with the Onay card costs 120 tenge (reduced — 60 tenge) for pupils, students and pensioners.

🔖

Add this page to your bookmarks

We update Almaty Metro as soon as anything changes — timetable changes, service disruptions, fare changes and important notices. Save the page and check it before you travel so you always have the latest information.

On this page